Paver Patio Base on Sandy Jersey Shore Soil
A paver patio lives or dies by what’s underneath it. The pavers you see are the easy part. The dig-out, the stone base and the compaction decide whether the patio stays flat for decades or starts to dip, rock and grow weeds in a couple of years. Here’s how to build a paver patio base that holds up on sand.
Along much of the Jersey Shore, the ground is sandy. That’s good news and bad news for a patio base, and it changes how we build one.
Paver patio base: why sandy soil is (mostly) good news
CMHA, the industry group behind paver standards (formerly ICPI), describes ideal conditions for a base as “a subgrade that is strong, structurally sound, and well-draining.” Sandy ground usually drains well, which is a big advantage. Water that drains away doesn’t sit under the base and soften it, and there’s less frost heave.
The catch: loose sand isn’t strong until it’s compacted, and near the bay, the lagoons or the ocean, the water table can sit high enough that the sand stays wet. CMHA’s guide specification also says not to install over saturated sand. A good base on shore soil deals with both.
New Jersey requires home improvement contractors to register with the NJ Division of Consumer Affairs.
How deep should a paver patio base be?
Here’s what the industry and a major manufacturer say:
- CMHA: a minimum compacted base of 4 inches for walkways and patios and 6 inches for residential driveways under ideal conditions. Weak soil, poor drainage or freezing call for thicker bases.
- Unilock: 4 to 6 inches for pedestrian walkways and 8 to 12 inches for driveways. Clay soils need to be dug deeper for drainage.
Those numbers are the compacted stone base. The total dig-out also has to make room for the bedding layer and the pavers themselves. The full depth depends on the paver you pick, so check its installation guide.
Step 1: Dig out to firm ground
We strip the sod and topsoil completely. Topsoil is soft and organic, and it settles. On sandy lots, the soil under it is often firm once compacted. Wherever the dig-out hits soft or wet spots, we dig those out further.
Go wider than the patio. Unilock recommends excavating past the finished edge by the same distance as the base depth. For a 6-inch base, that means 6 inches beyond each side, so the edges are supported and don’t roll off.
Step 2: Compact the subgrade
Before any stone goes in, the sand at the bottom of the dig-out gets compacted. This is the step that’s easiest to skip and the most important on loose shore soil. The bottom is also graded so the finished patio will slope away from the house.
Step 3: Stone base in lifts
Crushed stone base goes in 3 to 4 inches at a time (Unilock). Each layer is compacted before the next goes on. A standard plate compactor won’t compact much more than about 4 inches at once, so a 6-inch base takes at least two lifts. CMHA’s guide specification calls for compacting the base to at least 98% standard Proctor density and keeping the surface within 3/8 inch over 10 feet.
Where the ground stays wet or soft, a layer of geotextile fabric under the base helps keep the stone and soil from mixing. Unilock recommends fabric in clay-heavy or poorly draining ground.
Step 4: Screed the bedding layer
On top of the compacted base, a bedding layer, screeded to a nominal 1 inch under CMHA’s guide specification, gives the pavers a smooth, even bed. It’s screeded flat with pipes and a straightedge, and it isn’t compacted on its own. The final compaction of the pavers pushes it up into the joints.
Step 5: Lay, compact and lock it in
The pavers are laid, edge restraints go in around the perimeter, and the whole surface is compacted. Then joint sand is swept in to lock everything together.
Mistakes we see on shore patios
- Skipping compaction of the sand subgrade because it "looks firm"
- A base that stops at the patio edge, so the edges sink and spread
- Too much stone in one lift, compacted only on top
- No slope, so water sits on the patio or runs toward the house
- Building in a low, wet spot without dealing with the drainage first
- Waiting until spring to book. Several shore towns limit construction on summer weekends and holidays, and sandy ground can usually be dug and graded through the winter when it isn't frozen or flooded. Get the base in during the off-season: see summer construction rules in Jersey Shore towns.
Where Almark fits in
Almark Construction does the ground work for paver patios and walkways across Monmouth, Ocean and Middlesex County: dig-out, grading, stone base in compacted lifts and haul-away of the soil and sod, with our own excavator, skid steer and operator. We can build the paver patio or walkway on top. We call 811 at least three business days before digging, as New Jersey requires. Our crew hauls everything away as an NJ A-901 licensed hauler.
Call (732) 977-8388 or (848) 444-8100 with the patio size and a photo of the spot, or request a quote at www.almarkconstruction.com.
Almark Construction LLC · 1385 Highway 35, Suite 272, Middletown, NJ 07748 · NJ HIC #13VH14001400 · bonded
FAQ
How deep should a paver patio base be?
CMHA calls for at least 4 inches of compacted base for patios under ideal conditions, and Unilock recommends 4 to 6 inches. Weak or poorly draining soil needs more.
Is sandy soil good for a paver patio?
Usually, yes. It drains well, but loose sand has to be compacted first, and wet sand near the water needs extra attention.
Do I need fabric under my paver base?
Not always. Geotextile fabric helps where the ground stays wet, soft or clay-heavy, by keeping the soil and stone from mixing.
How wide should the base be?
Wider than the patio. Unilock recommends extending the excavation beyond the edge by the same distance as the base depth.
Call (732) 977-8388
Ready to get started?
Call the office at (732) 977-8388 or use the contact page. For site emergencies, call the 24/7 line at (848) 444-8100.