Excavation & Site Prep on Long Beach Island

Long Beach Island is about 18 miles of sand between Barnegat Bay and the Atlantic, split among six towns: Barnegat Light, Harvey Cedars, Surf City, Ship Bottom, Long Beach Township and Beach Haven. Around 10,000 people live on the island year-round, and the summer population climbs to roughly 100,000. Every truck, trailer and machine comes and goes the same way: Route 72 over the Manahawkin Bay Bridge (the Causeway), which lands in Ship Bottom. Almark Construction handles excavation and site prep on Long Beach Island with our own excavator, skid steer and operators.

Almark Construction brings its own excavator, skid steer, dump trailers and roll-off dumpsters to the island, with our own operator. We’re based in Middletown, bonded, and licensed under NJ HIC #13VH14001400.

Excavation and site prep on Long Beach Island: site work we do on LBI

Before any digging, New Jersey law requires a call to NJ One Call (811) so buried utility lines get marked.

Building on LBI sand

Island ground is sand. It drains fast, which helps, but it moves: it shifts under a parking pad, washes out at the edge of a patio and settles under anything set on top of it loosely. The fix is the same on almost every lot: dig out the soft sand, put down stone, and compact it in layers. Our sandy vs. clay soil guide explains why sand behaves this way. Our patio base on sandy soil post walks through the layers.

One bridge, tight lots, short seasons

Getting work done on the island is mostly logistics. Lots are narrow, houses sit close, and on-street parking for a trailer is scarce in July. We run our machines that fit through side yards and gates. We plan each job so the dump trailer or dumpster is in and out without blocking the block.

Each town also sets its own work hours. In Beach Haven, for example, construction and demolition can’t start before 8 a.m. on weekdays from Memorial Day through Labor Day (7 a.m. the rest of the year), Saturdays start at 9 a.m.. No construction work is allowed on Sundays, Thanksgiving or Christmas. Harvey Cedars adopted a summer moratorium on disruptive utility and roadway work in May 2026. Our guide to summer construction rules in Jersey Shore towns lists the rules town by town. We check the rules for your borough before we schedule. The simplest answer is usually the off-season: fall through early spring is the easiest time to get a machine onto an LBI lot. Book early if you need the work done before Memorial Day.

Water and storms: what site work can and can't fix

Grading and stone help rain leave a yard instead of sitting under the house or in the driveway. They can’t keep out the bay or the ocean. When Hurricane Sandy hit in 2012, a nine-foot surge damaged homes on both the ocean and bay sides, some streets were buried under up to four feet of sand. The Causeway stayed closed to residents for 13 days. We’ll tell you plainly what a job will fix, what it won’t, and make sure we’re not sending water onto the lot next door. After a storm, our storm cleanup service can move sand and debris with the skid steer.

Haul-away off the island

Everything that leaves an LBI job crosses the Causeway, so hauling is part of the plan from day one. We own our dump trailers and roll-off dumpsters and are an NJ A-901 licensed hauler, so the same crew that does the site work takes the sand, soil and debris away.

Clearing out a rental before the season? In Long Beach Township, Ship Bottom, Harvey Cedars and Barnegat Light the Ocean County Fire Marshal does the smoke and CO alarm inspection for rentals, and Beach Haven requires seasonal rentals to apply for their fire safety inspection every year by May 31. Our guide to shore rental inspections, town by town has the details; confirm with your borough before you book.

Before we dig

What we don't do

We don’t do dune or beach work, bulkheads, docks, house lifting, foundations, pilings or utility work. We don’t rent out machines without our operator.

Where we work

Ship Bottom, Surf City, Beach Haven, Harvey Cedars, Barnegat Light and Long Beach Township’s neighborhoods from Loveladies and North Beach down to Holgate. On the mainland side we also work in Stafford Township and Manahawkin, Barnegat and Lacey, Little Egg Harbor and Tuckerton. The rest of Ocean and Monmouth County.

FAQ

Yes. We bring our own excavator, skid steer, dump trailers and operator to Ship Bottom, Surf City, Beach Haven and the rest of the island’s six towns.

Yes. We dig out the loose sand and build a compacted stone base in layers so the pad or patio stays level.

Fall through early spring. Summer brings crowded streets and tighter work hours in some boroughs; Beach Haven, for example, doesn’t allow construction work on Sundays. Book early if you need the job done before Memorial Day.

Yes. We’re an NJ A-901 licensed hauler with our own dump trailers and dumpsters. So we take the material over the Causeway as part of the job.

No. Grading and stone help rainwater drain, but they can’t stop bay flooding or storm surge. We’ll tell you what a job can and can’t fix before we start.