Almark Construction LLC

Tenant Fit-Outs in Toms River and Brick, NJ

Looking for a tenant fit-out in Toms River or Brick? Almark Construction can help. Most of the commercial space in Toms River and Brick is in strip centers and pad sites along a handful of roads: Route 37, Route 9 and Hooper Avenue in Toms River. Also, Route 70, Route 88 and Brick Boulevard in Brick. When a tenant moves out of one of those units, the landlord wants the next one open and paying rent as soon as possible. Also, the incoming tenant wants a space that fits their business on opening day.

Almark Construction builds out those spaces. We’re a general contractor and complete property maintenance company based in Middletown, working across Ocean and Monmouth County with our own crews, equipment and trucks and trailers. We’re bonded, licensed under NJ HIC #13VH14001400, and an NJ A-901 licensed hauler, with 19 five-star reviews on Google.

What a fit-out with Almark includes

Strip-center turnovers in Toms River

Toms River is the county seat of Ocean County. Also, its commercial side is mostly retail and service space: strip centers on Route 37 and Route 9. Also, the shopping area around the Ocean County Mall and Seacourt Pavilion off Hooper Avenue. A typical turnover there is a second-generation unit: a former shop, salon, office or takeout space that has to be cleared and rebuilt for a different tenant.

We plan that kind of job around the rest of the center. The work stays inside the unit, shared walls and the neighbors’ storefronts are protected. Also, debris goes out the back so the parking lot and the other tenants’ doors stay clear.

Route 70, Route 88 and Brick Boulevard in Brick

Brick is one of Ocean County’s largest towns. Also, its commercial space runs along Route 70, Route 88 and Brick Boulevard (County Route 549), from large centers like Brick Commons at Route 70 and Chambers Bridge Road to smaller strips and standalone pad buildings. Pad sites and freestanding buildings often need more than an interior build-out: exterior repairs, door replacements, or site work around the building. Our own excavator and skid steer handle the site work. So the outside can be finished on the same schedule as the inside.

Permits and the town's sign-off

Every New Jersey town enforces the Uniform Construction Code through its own construction office. Also, a fit-out is usually an alteration permit based on your architect’s drawings.

In Toms River

Construction permits run through the township’s Building Department. The township’s zoning code (§ 348-3.7) also requires a development permit from the township’s Administrative Officer before a building permit is issued to alter a building or put up a sign. A certificate of occupancy from the Construction Official for each change or addition of commercial occupancy. For anything other than a one- or two-family home, that certificate isn’t issued for a change of ownership, change of use or new use until the township’s Bureau of Fire Prevention approves it.

Where to file: the Building Department, 33 Washington Street (732-341-1000, ext. 8320), open Monday to Friday, 8:30 a.m. to 4:30 p.m. Forms can also be emailed to buildingdepartment@tomsrivertownship.com. Subcode officials answer questions in person from 1 to 2 p.m. on weekdays.

In Brick

Permits are issued by the Building Department, also called the Division of Inspections. Zoning is a separate department, and the township’s list of work that needs a zoning permit includes a change of use in a commercial building and commercial construction. The Zoning Officer reviews and approves those applications.

Vacant units in Brick

Through December 31, 2026 (unless the township council extends it), Brick waives its own construction and enforcing-agency fees for work done only to renovate a previously occupied commercial unit of 5,000 square feet or less that has been vacant for 12 months. So it can get a certificate of occupancy. State construction code surcharge fees still apply. Properties with unpaid taxes or open property maintenance violations don’t qualify (Township Code § 145-6).

You can't open until the town signs off

Under N.J.A.C. 5:23-2.23, an altered space can’t be occupied until a certificate of approval is issued. A change of use (for example, retail to a restaurant or medical office) needs a certificate of occupancy before the new use begins.

Signs

Can need their own approval, depending on the town and the center.

We check the current requirements with the town for your address before we schedule. Also, we build the inspections into the timeline so the final sign-off doesn’t push back your opening date.

Planning the budget

We don’t publish prices, because fit-out costs depend on what’s already in the space, how many walls and doors the new layout needs, ceilings, finishes and the licensed-trade work. Our guide to what a commercial tenant fit-out costs walks through published 2026 cost ranges, what drives them and how landlord work letters and TI allowances work. Landlords getting a vacant unit ready can start with preparing a space for a tenant fit-out and our vacant store cleanout and re-leasing prep page. Franchise and brand-standard build-outs are covered on our retail build-outs page.

After opening day

Once a space is built out, we can keep the property up for the landlord or manager: repairs, unit turnovers, cleanouts and site upkeep. In winter we clear commercial lots with our CAT 259D3 skid steer and operator (see commercial snow removal in Toms River and Brick).

Towns we cover

Toms River (including Silverton, Gilford Park, Pleasant Plains and West Dover), Brick, Lakewood, Jackson, Point Pleasant, Berkeley, Manchester and the rest of Ocean County, plus Monmouth County from our base in Middletown. See our general contractor page for Toms River and our general contractor page for Brick. Farther north in western Monmouth, see tenant fit-outs in Freehold and Manalapan, and near our Middletown base, tenant fit-outs in Red Bank and Middletown.

Frequently asked questions

Yes. We build out retail, office and service spaces in strip centers and pad buildings along Route 37, Route 9 and Hooper Avenue in Toms River and Route 70, Route 88 and Brick Boulevard in Brick, from the strip-out of the old build-out to the finished space.

Yes. We keep the work inside the unit, protect shared walls and the neighboring storefronts. Also, take debris out the back so the lot and the other tenants’ entrances stay clear.

The work needs permits from the town’s construction office: in Toms River, the Building Department. Also, in Brick, the Building Department (Division of Inspections). We confirm the requirements for your address before we schedule and plan around the inspections.

Not until the town signs off. Under New Jersey’s construction code (N.J.A.C. 5:23-2.23), an altered space needs a certificate of approval before it’s occupied. Also, a change of use needs a certificate of occupancy before the new use begins.

Often, yes. In Toms River, the zoning code (§ 348-3.7) requires a development permit before a building permit for alterations or signs. Also, a certificate of occupancy for each change or addition of commercial occupancy, with Bureau of Fire Prevention approval first for a change of ownership, change of use or new use. In Brick, a change of use in a commercial building and commercial construction both need a zoning permit from the Zoning Officer.

We check the requirements for your address before we schedule.

It depends on the space and the scope, so we give a written estimate after a walkthrough. Our fit-out cost guide explains published 2026 cost ranges and what moves a project up or down.

Call (732) 977-8388

Tenant fit-out in Toms River: get a quote

Send us the address, the unit size and your layout or drawings if you have them. We’ll walk the space with you. Call (732) 977-8388 and ask for Mark Kelber, Operations Manager, or request a quote at www.almarkconstruction.com.

Almark Construction LLC 1385 Highway 35, Suite 272, Middletown, NJ 07748

For state construction rules, see the NJ Division of Codes and Standards.