06 / Lot and land clearing
Tree rules in Berkeley and Lacey
Trees in Berkeley. Berkeley's tree removal and replacement ordinance requires an approved tree removal plan, filed with the Zoning Officer, before the township issues a building permit for a new structure. For a single-family home that isn't part of an approved development, clearing is limited to no more than 50 percent of the side and rear yard setbacks. Check with the township before any trees come down; we clear brush, stumps and undergrowth.
Trees in Lacey. Lacey's tree ordinance applies to unimproved or vacant land: a permit from the Zoning Officer is needed before regulated trees are removed (deciduous trees over 3 inches in diameter, evergreens over 4 inches, dogwood and American holly 1 inch or larger), and clearing around a building, driveway or septic system is generally limited to 15 feet around its perimeter. Check with the township before any trees come down; we clear brush, stumps and undergrowth.
Soil erosion. Disturbing more than 5,000 square feet, including clearing and grading, generally needs a soil erosion and sediment control plan certified by the Ocean County Soil Conservation District in Forked River. Building one single-family home is exempt unless it's part of a larger subdivision or site plan.
811. New Jersey requires a call to 811 at least three business days before digging. We make that call before any job that involves grubbing, digging or grading. 811 doesn't mark private lines, so show us your well, septic and any buried lines to a shed or garage.