Aerial view of fresh earthwork with track marks and a machine at work

Almark Construction LLC · Excavation and site work

Building a Base for a Shed or Storage Container in NJ

A shed or storage container is only as good as what it sits on.

  • NJ HIC License13VH14001400Home improvement contractor
  • NJ LicenseA-901Licensed waste hauler
  • Licensed andBondedFinancing available
  • Emergency Service24/7Call (848) 444-8100 any hour

A shed or storage container is only as good as what it sits on. Set it on bare ground and it settles, racks out of square, and the doors stop closing. The floor stays damp and rots. A level, compacted stone pad fixes all of that. It’s one of the most common small jobs we do with an excavator and skid steer. A good shed base is a level, compacted stone pad.

Here’s how a good pad goes in, how big to make it and what to ask your town before you start.

Step 1: Ask the town first

Shed rules in New Jersey depend on the size of the shed and on your town, and they’ve changed over the years. Two questions to ask your town’s zoning and construction offices before anything is built:

  1. Do I need a zoning permit? Many towns require one for any shed, mainly to check setbacks from property lines.
  2. Do I need a construction permit? Small sheds are often exempt, and larger ones aren’t.

Here’s one local example. Stafford Township in Ocean County says a shed of 200 square feet or less. No more than 10 feet tall, doesn’t need a construction permit but does need a zoning permit. It must be properly anchored to the ground. A shed of 201 square feet or more needs a construction permit, with plans showing the construction, foundation and anchoring. Its foundation must go below the frost line, which the township gives as 30 inches. Your town’s numbers may be different, so check.

Storage containers

Are their own question. Some towns treat a container as an accessory structure, some limit how long a temporary one can stay. Some don’t allow them in residential zones at all. Ask before you order one.

If your property is in a flood zone, ask about that too, since flood rules can affect what you can place and how it’s anchored.

In the Pinelands? Parts of 14 Ocean County towns are in the state Pinelands Area. A shed accessory to a single-family home doesn’t need a Pinelands Commission application, but clearing more than you need for it can be a violation. You still need the town’s permits. In the Pinelands? Check what you can clear without a Commission application.

Before any digging, New Jersey law requires a call to NJ One Call (811) so buried utility lines get marked.

Step 2: Pick the spot

A good spot is

  • High and dry. Not in a low area where water collects, and not in the path of runoff
  • Within the setbacks the town gave you
  • Reachable. You'll want a clear path for a wheelbarrow, a mower or, for a container, the delivery truck
  • Clear of buried lines. New Jersey requires a call to 811 at least three business days before digging. We make that call before every machine job

Step 3: Size the pad

Make the pad bigger than the shed, so rain dripping off the edges lands on stone instead of splashing mud onto the walls. A common rule of thumb is about a foot of extra stone on every side. A 10 × 12 shed gets roughly a 12 × 14 base.

For a storage container, the pad needs to support the container’s full footprint and the delivery. Ask the container company how they set it and what kind of surface they need.

Aerial view of a graded sand pad with pallets of block and fill piles

Excavation and site work in Monmouth and Ocean County. Call or request a quote.

How a shed base goes in

  1. Mark and dig out. We strip the grass and topsoil and dig down to firm ground. That’s because topsoil is soft and organic and will settle under load.
  2. Level the subgrade. The bottom of the dig-out is graded flat and compacted.
  3. Fabric (optional). On soft or wet ground, a layer of geotextile fabric helps keep the stone from sinking into the soil.
  4. Stone in lifts. Crushed stone goes in a few inches at a time, and each lift is compacted.
  5. Screed it level. The top of the shed base is screeded flat and checked with a level, so the shed sits square.
  6. Edges and drainage. The finished pad sits a little above the surrounding ground, with the yard sloping away from it so water doesn’t pool against the base.

A pad on a slope, however, needs more work. One side gets dug in, the other side gets built up, and sometimes the high side needs a swale to carry water around the pad.

To estimate how much stone you need, use length × width × depth in feet ÷ 27 for cubic yards. Our cubic-yards guide has worked examples.

Stone pad or something else?

For most garden sheds, a compacted stone pad is the simplest choice. It drains, it’s easy to level, and it can also be adjusted later. Larger sheds may need the foundation your town’s construction permit requires, like the below-frost footing in Stafford’s rules, so follow the permit plans.

We do the ground work

Almark Construction digs out, grades, lays and compacts stone pads for sheds, storage containers and outbuildings across Monmouth, Ocean and Middlesex County, using our own excavators and skid steers, with our own operator. We haul away the dirt and sod as an NJ A-901 licensed hauler with our own dump trailers.

Call (732) 977-8388 with the shed size and a photo of the spot, or request a quote at www.almarkconstruction.com.

Almark Construction LLC · 1385 Highway 35, Suite 272, Middletown, NJ 07748 · NJ HIC #13VH14001400 · bonded

Serving all of New Jersey. Home base: Monmouth & Ocean County

Questions

FAQ

(732) 977-8388

It depends on the shed’s size and your town. Many towns require a zoning permit for any shed, and larger sheds need a construction permit. Stafford Township, for example, requires a construction permit for sheds over 200 square feet.

A common rule of thumb is about a foot bigger than the shed on every side, so a 10 × 12 shed gets roughly a 12 × 14 pad.

Yes. A dug-out, compacted crushed-stone pad is a common base for garden sheds. Larger sheds may need the foundation your town’s permit calls for.

Check with your town first. Rules on containers vary, and some towns limit or don’t allow them in residential zones.

Request a quote

Call (732) 977-8388

Ready to get started?

Call the office at (732) 977-8388 or use the contact page. For site emergencies, call the 24/7 line at (848) 444-8100.

  • NJ HIC 13VH14001400 and NJ A-901 licensed
  • Bonded
  • Written scope before work starts
  • Financing available through Acorn Finance. Ask us when you request your quote.

Check your financing options

  1. 01Project
  2. 02Details
  3. 03Contact
What kind of project is it?

Pick one and we will ask the right questions.

Tell us about the work

A few details so the right person calls you back.

For an emergency, calling is fastest: (848) 444-8100, any hour.

How do we reach you?

We call back to set up a site visit.

Thanks. We'll call you back to set up a site visit.

Your request is with our office. For an emergency, call (848) 444-8100, any hour.