Trees in Roosevelt
Roosevelt's tree protection chapter (Chapter 19, amended May 2024) requires a permit from the borough's Tree Conservation Officer before removing any tree 6 inches across or larger at chest height, and smaller ornamentals count too: 3 inches for dogwoods and American holly, 4 inches for other ornamental trees. Trees to come down are marked with a yellow paint dot, removing more than 20% of the trees outside the area you actually need is prohibited, and street trees need borough authorization. Removals over a small allowance set by zoning district have to be replaced. Brush and undergrowth are not trees, but if trees are part of the plan, the permit comes first.
Roosevelt's historic district
Under Chapter 24 of the borough code, all of Roosevelt is one historic district. The Planning Board serves as the borough's Historic Preservation Commission. Its review centers on subdivisions and site plans, which have to fit the district's open-space and greenbelt plan, and on the original 1936 to 1939 homes, which can't be demolished unless the borough finds them beyond repair. If your clearing is part of a subdivision or site plan, the Planning Board sees it first. For ordinary yard and lot clearing, the tree permit above is the rule to check. Roosevelt's landscape chapter (Chapter 22), which has its own land-clearing and buffer sections, works the same way: it applies to new subdivisions and site plans, and single-family homes and duplexes are exempt.
Borough land next door in Roosevelt
Because so many Roosevelt lots back up to borough open space, know where your line is. The same chapter says land set aside as borough-owned green space stays green space for good. We clear your lot only, up to the property line on your survey.
Trees in Allentown
Allentown replaced its tree chapter in July 2024 (Ordinance 10-2024). A permit, applied for through the Municipal Clerk with no application fee, is needed to remove a street tree 2.5 inches across or larger or any other tree 6 inches or larger. No more than 10% of the trees on a lot may come down in 12 months, removed trees have to be replaced or paid into the Allentown Tree Fund, and trees in wetlands, stream buffers, planned buffers or on slopes over 20% can't be removed.
Allentown's historic district
Inside the district, the borough's Historic Preservation Commission reviews exterior changes, including fences, landscapes and hardscapes, even when no construction permit is needed. If clearing is part of a new fence, patio or yard project on a historic-district property, file with the HPC first. The application goes to the Borough Clerk at least ten days before the meeting.
Soil erosion
Disturbing more than 5,000 square feet, including clearing and grading, generally needs a soil erosion and sediment control plan certified by the Freehold Soil Conservation District, which covers Monmouth County. One single-family home is exempt unless it's part of a larger subdivision or site plan.
811 and private lines
New Jersey requires a call to 811 at least three business days before digging. We make that call before any job that involves grubbing or grading. 811 doesn't mark private lines, so show us your septic field, well, irrigation and any buried lines to a shed or garage.
Neither Roosevelt nor Allentown is in the Pinelands Area, so the Pinelands Commission's clearing rules don't apply.