Trees in Neptune
Neptune's tree removal and tree cutting section (§ 12-4, Ord. No. 10-04) requires a permit to remove trees 4 inches or more in caliper. The Conservation Officer inspects, and the permit comes from the Zoning Officer through the township's Land Use Department. Existing single-family homes clearing one acre or less are exempt. A homeowners association removing ten trees or fewer in a year gets its permit without replacement trees. New homes can take up to half the trees on a building lot without replacement. Commercial and industrial sites replace every tree removed, on site or by payment into the township's tree fund. Permits last one year. Check with the township before any trees come down; we clear brush, stumps and undergrowth.
Neptune work hours
Neptune's noise code allows heavy or power construction equipment from 8 a.m. to 7 p.m. Monday through Saturday, only 9 a.m. to 4 p.m. on Saturdays from Memorial Day to Labor Day, and not on Sundays, Memorial Day, July 4 or Labor Day. We schedule machine work in those hours.
Trees in Eatontown
Eatontown's tree rules (amended by Ord. 14-2023) cover deciduous and evergreen trees 6 inches or more in diameter measured a foot above the ground, plus American holly, dogwood and broadleaf evergreens from 1 inch. Permits come from the Zoning Officer. A residential lot under one acre needs no borough approval for a tree that isn't on a public easement or right-of-way. On a residential lot of an acre or more, the Borough Engineer reviews it. Trees on a public easement or right-of-way go through the Department of Public Works. Removed trees are replanted or paid for through the borough's Tree Fund. Check with the borough before any trees come down; we clear brush, stumps and undergrowth.
Trees and commercial land in Shrewsbury
In Shrewsbury Borough, the Shade Tree Commission handles tree permits. For new construction or a home addition with a zoning permit and no Planning Board or Zoning Board approval, the owner or contractor files an application with a landscape plan showing which trees and shrubs come out. On commercial land, excavating or removing trees needs the Commission's approval, though clearing or mowing weeds, ground cover and growth under 2 inches thick on ground that was already kept open is excluded. Check with the borough before any trees come down; we clear brush, stumps and undergrowth.
Not in the Pinelands
No Monmouth County town is on the Pinelands Commission's list of towns with land in the state Pinelands Area, so none of the three is.
Soil erosion
Disturbing more than 5,000 square feet, including clearing and grading, generally needs a soil erosion and sediment control plan certified by the Freehold Soil Conservation District, which covers Monmouth County. Building one single-family home is exempt unless it's part of a larger subdivision or site plan.
811
New Jersey requires a call to 811 at least three business days before digging. We make that call before any job that involves grubbing, digging or grading. 811 doesn't mark private lines, so show us your sprinkler lines, septic field and any buried lines to a shed, pool or garage.